Timeline: Actual Modular Elevator Project

Revolution MillsWhen it comes to elevators in multi-story construction projects, there is often significant and well earned moaning and groaning from general contractors as their past experiences have been fraught with problems. The elevator becomes a stumbling block due to delays for several reasons; weather, hoistway construction, availability of elevator parts, and lack of qualified elevator personnel have all contributed to a lengthy timeline for the entire project. At Phoenix Modular Elevator we shorten the process significantly, but there are still a lot of questions about the timeline and how we can make elevators easy. So, to demonstrate exactly how the process works, we are taking a typical project and following the timeline from start to finish.

The project we will be following is a typical 2 -stop elevator going into a private business and apartment complex. It is a machine roomless, holeless hydraulic elevator with fifteen feet of travel. The building owner wanted three walls with one-hour fire rating and one glass wall so the passengers could see outside to an ornate courtyard, with all stainless steel doors and entrances. Click here for the whole surprising timeline! 

Free QQ Button 2
Click for a free quick quote.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s